Discuss Your Next Design Project
Company / News

Production Hell: Unpredictable Field Failures Solved by Voler

There’s nothing worse than production stopping for design issues. A recent client asked us to help solve an intermittent design problem causing unpredictable field failures and costly product returns in a product designed by another firm. We quickly determined the root of the problem and provided a way for the device to power down fully so the battery life was conserved. This allowed the company to continue producing products.

TELL US ABOUT YOUR NEXT DESIGN PROJECT

Do you have a question about our services, pricing, samples, resources, or anything else?

Contact Us Now

Related News

Newsletter: Volume 2020 Issue 3 Newsletter | Voler Systems

Top Articles 5G Technology: Hype vs Reality By Walt Maclay, Voler Systems The...

Read More

Enhanced Solar Roofs Manufacturing Efficiency | Voler Systems

A new way of generating solar energy is to use roofing material that has the solar cells...

Read More

In the news "Finding some "Sense" in 2015 | Voler Systems

January 27, 2015 – Walt Maclay appeared in the MDT blog.

Read More

Interested in Learning More? Contact Us Today!